Floor Installation & Care Instructions (4MaxFloor)

Welcome! This page includes essential guidelines for installation, acclimation, and daily care to help you get the best performance and longest life from your flooring.

If you have questions, contact us anytime:

  • WhatsApp / Phone:+31 6 57 30 84 84

  • Email: Info@4maxfloor.nl

1) Before Installation (Important)

Acclimation

  • Keep the flooring in the room where it will be installed for 24–48 hours before installation.

  • Store the boxes flat, in a dry indoor area.

  • Recommended room conditions:

    • Temperature: 18–25°C

    • Relative humidity: 40–60%

Subfloor Requirements

A good result depends on a properly prepared subfloor:

  • Must be clean, dry, stable, and level

  • Maximum unevenness: 2–3 mm per 2 meters

  • Remove dust, paint, oil, or loose materials

Moisture (Critical)

  • Concrete or cement subfloors must be fully dry before installation.

  • Always use the correct moisture barrier / underlayment when required.

2) Installation Guidelines

These are general guidelines. Always follow the product-specific installation method (click system, glue-down, etc.).

Expansion Gaps

  • Leave an expansion gap of 8–10 mm around all walls, pipes, and fixed objects.

  • Use appropriate profiles/transition strips at doorways and large areas.

Underlayment

  • Use a compatible underlayment (sound-reducing where needed).

  • For apartments, ensure compliance with building requirements (e.g., sound reduction standards).

Cutting & Finishing

  • Use proper tools and blades to avoid chipping.

  • Install skirting boards so they cover the expansion gap without pressing the floor tight.

3) Underfloor Heating (If Applicable)

Underfloor heating can be compatible, but must be managed correctly:

  • Turn heating off 24 hours before installation

  • Start heating gradually after installation:

    • Increase temperature by max. 2–3°C per day

  • Surface temperature should not exceed 27°C

  • Avoid sudden temperature changes

If you’re unsure, contact us before proceeding.

4) After Installation

First 24 Hours

  • Avoid heavy traffic during the first day (especially for glue-down installations).

  • Do not place heavy furniture immediately unless the installation method allows it.

Furniture Protection

  • Use felt pads under chairs and furniture legs.

  • Use protective mats under office chairs (especially with hard wheels).

5) Daily Cleaning & Maintenance

Recommended Cleaning

  • Sweep or vacuum regularly (use a soft brush setting).

  • Damp mop with a well-wrung mop (not wet).

  • Use a pH-neutral floor cleaner suitable for your floor type.

Do Not

  • Do not use steam cleaners

  • Do not use abrasive pads or harsh chemicals (bleach, ammonia)

  • Avoid soaking the floor with water

Spills

  • Wipe spills immediately.

  • Do not let standing water remain on the surface.

6) Protecting Your Floor

  • Use doormats at entrances to reduce sand and dirt

  • Avoid dragging heavy objects

  • Keep pets’ nails trimmed

  • For sunlight exposure, use curtains/blinds to reduce fading over time

You didn’t come this far to stop

black blue and yellow textile
black blue and yellow textile